LESSON 2 / 6 · Sector reinforcement

Check eligibility and evidence — Facilities & maintenance

Check eligibility and evidence in facilities & maintenance. Worked case, method, model answer and quiz.

Reviewed 2026-09-09 · AI editorial review

By the end of this lesson, you will be able to build a sector evidence register and identify a blocking gap.

Common to all countries

Turn capability into verifiable evidence

Read each participation condition separately from the award criteria. A participation condition asks whether the bidder is eligible or capable; an award criterion compares admissible offers. A beautiful method statement does not repair a missing mandatory authorisation. Record the entity that must hold each credential, its scope, validity date and the moment at which it is required.

Build an evidence register with requirement, document, issuing body or owner, expiry, proposed bid location and responsible colleague. If relying on another entity, establish the permitted arrangement and obtain a real commitment. Remove confidential personal or client information that is not needed. Never replace a missing document with a claim that it will probably be available.

Worked example — Clean four municipal buildings

This is a fictional teaching case. Quantities, prices and contractual conditions below are assumptions for the exercise, not legal requirements or market benchmarks.

Use comparable multi-site references, supervisor coverage and training records for the proposed tasks. Demonstrate access to equipment and consumables. If a product label is requested, tie the evidence to the actual product and the accepted proof requirements.

Gap to resolve. The intended partner has not confirmed availability. Record the commitment as open, assign a deadline and plan a replacement or no-bid decision. An authentic document outside the relevant scope does not solve the gap.

Country specific — what to verify

Check applicable wages, working-time rules and any staff-transfer obligations for this contract. Verify chemical handling, waste disposal and site access requirements. EU green procurement criteria are a reference; the actual tender determines the requested environmental evidence, alongside applicable law.

Trade licenses and relevant hygiene qualifications. Use the destination-country module and the actual tender pack. The sources below are references with their own scope; they do not form a single worldwide regime. For the general method, revisit the foundations.

Put it into practice

Create four evidence-register rows: relevant reference, team capability, regulatory evidence to verify and partner commitment. Include holder, validity, document and the action if it is missing.

Model answer

Use comparable multi-site references, supervisor coverage and training records for the proposed tasks. Demonstrate access to equipment and consumables. If a product label is requested, tie the evidence to the actual product and the accepted proof requirements. The register must explicitly flag the uncommitted partner and unverified regulatory evidence. Neither a partner name nor a ticked box proves available capacity.

Keep this worksheet in your working file. The quiz below checks the lesson’s decisions; passing it is neither a professional qualification nor a guarantee of an award.

Sources

CHECK YOUR UNDERSTANDING

End-of-lesson quiz

4 questions. 3 correct answers to pass. Retake the quiz as often as you like.

Results are saved only in this browser. Clearing its data removes them.

01. Which evidence is appropriate for this contract?
02. The partner has not confirmed availability. What follows?
03. Mandatory evidence is missing but the response is excellent. Which analysis is correct?
04. How should you apply the sector requirements described in this lesson?